2020 Roadworks


Hedgehog Walk - Winter 2020

The worst section of Hedgehog Walk was scraped and levelled.


Bush Drive (Part 1) - Winter 2020

20 tonnes of MOT Type 1 crushed granite was used to fill some of the deep puddles in the central section of Bush Drive.


Bush Drive - Autumn 2020

Scraped and levelled the bottom section of Bush Drive to the corner with Seaside Lane.


Church Lane - Winter 2020

2 tonnes of MOT Type 1 crushed granite was used to fill some of the remaining of the potholes in Church Lane.


Abbots Way - Autumn 2020

Scraped and levelled the bottom section of Abbots Way.


Church Lane (Part 2) - Autumn 2020

A further 10 tonnes of MOT Type 1 crushed granite was used to level the next section of the road.


Church Lane (Part 1) - Autumn 2020

10 tonnes of MOT Type 1 crushed granite was used to level the worst section on the corner.


Church Lane - Summer 2020

Initial scrape and level, removed large pieces of rubble and used 2 tonnes of crushed tarmac to stabilise a section filled with loose stones.