The worst section of Hedgehog Walk was scraped and levelled.
20 tonnes of MOT Type 1 crushed granite was used to fill some of the deep puddles in the central section of Bush Drive.
Scraped and levelled the bottom section of Bush Drive to the corner with Seaside Lane.
2 tonnes of MOT Type 1 crushed granite was used to fill some of the remaining of the potholes in Church Lane.
Scraped and levelled the bottom section of Abbots Way.
A further 10 tonnes of MOT Type 1 crushed granite was used to level the next section of the road.
10 tonnes of MOT Type 1 crushed granite was used to level the worst section on the corner.
Initial scrape and level, removed large pieces of rubble and used 2 tonnes of crushed tarmac to stabilise a section filled with loose stones.